Gyeongchun Line Electrified Double Track Railway Section No.7
- Field
Railways/Subways
- Client
Korea Rail Network Authority
- Period
1999,12 ~ 2011.12
- Location
Chuncheon-si, Gangwon-do, Korea
- Project Epitome
Total length : L=12,146km, Bridge : 5EA(L=3.2km), Tunnel : 4EA(L=8.2km),
Station : 2EA