Contract 911, Design and Construction of Depot for Downtown Line (Singapore)
- Field
Railways/Subways
- Client
Land Transport Authority (LTA)
- Period
2009.03 ~ 2015.07
- Location
Singapore
- Project Epitome
1. Area : 300,000 m2(1.8km ¡¿ 170m)
2. Earth Work : 2,550,000 m3
3. Improvement of Soft Ground : 109,200m2
4. Building : 24 nos(Gross Floor Area : 60,000m2)
5. Tunnel : 199m