Project Search

Gulpocheon (Stream) Tailrace Phase.2 Sector.2

slider image

  • Field Ports/Waterworks
  • Client K-Water
  • Period 2005.05 ~ 2012.02
  • Location Si-Cheon Dong, Si Gu, Incheon
  • Project Epitome 1) Drainage L=4.7km
    2) Road 5.68km, Road(Northside) 5.56km