Noryangdaegyo Bridge(Gohyun - Hadong IC 2 National Highway)
- Field
Roads/Bridges
- Client
Busan Regional Construction and Management Administration
- Period
2009.10 ~ 2018.06
- Location
Solchon-myon, Namhae-gun~ Gumnam-myon, Hadong-dun, Gyong-nam, Korea
- Project Epitome
1. Total Length : 3.1km(Width : 19.5m, 4Lanes)
2. Second Namhae Bridge : 990m(Suspension Bridge)
3. Tunnel : 1EA(495m)